2024/12/01 The Big Experiment on Chevron Braced Frame was Completed!!

Experiment movies
Loading https://youtu.be/ssMxB6cWW9o
Fracture https://youtu.be/KiWy85m7iNM

Test specimen 1 of the large-scale brace experiment (Chevron Brace Frame) has been completed! This is the largest scale laboratory experiment ever conducted in the experimental building, and the all members have been involved in preparations. In addition, Professor Tagawa, Professor Chen, and students from Hiroshima University’s Architectural Structural Laboratory helped us prepare for the experiment! thank you very much! ! Thank you very much to Lilliann, Roosevelt, and all the laboratory members for their hard work!

“Thanks to everyone’s hard work, even late into the night, we were able to finally test the biggest test specimen in the history of this lab! It’s a huge achievement, and we’ve learned a lot! Looking forward to the next four specimens!” (by Lilliann)

Graduation of Mr. Li

Mr. Li, who has completed his PhD program, is leaving Hokkaido.
We would like to thank Ms. Li for being a reliable senior in our lab, teaching us a lot about experiment preparation and research, and leading our lab!
We wish your continued success!!